HECO change in NEM submittal process

Posted on Wednesday, September 02, 2015

You should have already received notice from HECO that they've changed the requirements for NEM submittals and will no longer accept generic single line drawings.  Here's the pertinent part from the HECO announcement:

Site-Specific Single-Line Drawings

Hawaiian Electric Only: Beginning July 15, 2015, we will

no longer accept generic single-line drawings (SLD) of PV

systems, including the sample SLD previously available on

our website. Instead, please ensure that each submitted SLD

is unique to the project in question and contains all relevant

technical information.

Maui Electric and Hawai`i Electric Light have always required

site-specific drawings.

blog comments powered by Disqus